+86 150 0637 7597      boss@sdzyja.com
Project
Home » Project » Overseas Project » Steel Structure Project for the Pengerang Independent Deepwater Terminal Trestle Pipe Rack (Malaysia)

Steel Structure Project for the Pengerang Independent Deepwater Terminal Trestle Pipe Rack (Malaysia)

Pengerang Independent Deepwater Terminal Trestle Pipe Rack Steel Structure Project (Malaysia)

Structural Type: Pipe rack frame

Location: Pengerang, Malaysia

Project Overview: Our company’s scope of work covered the fabrication, transportation, and installation of the steel structures. The primary components consist of square hollow sections and angle steel, with a total steel tonnage of 11,605 tons.

Pengerang-Independent-Deepwater-Terminal-Trestle-Pipe-Rack-Steel3
Pengerang-Independent-Deepwater-Terminal-Trestle-Pipe-Rack-Steel4
Pengerang-Independent-Deepwater-Terminal-Trestle-Pipe-Rack-Steel11
Pengerang-Independent-Deepwater-Terminal-Trestle-Pipe-Rack-Steel10

It specializes in three core business areas: steel structure manufacturing, seamless steel pipe production, and intelligent logistics services. The group comprises ...

QUICK LINKS

CAPABILITIES

PRODUCTS

CONTACT US

  +8615006377597
  +8615006377597
   boss@sdzyja.com
  No. 299, Liaohe Road, Economic and Technological Development Zone, Liaocheng City, Shandong Province, China
 
Copyright © 2026 Shandong Zhong Yue Steel Group Co., Ltd. All rights reserved. Sitemap Privacy Policy